58300liters 24486kgs 3 Fuwa /BPW Axles GLP/LPG/Plg Tank Trailer
- USD 49500.50 /Unit
- 1 Unit
- 17 Unit
- 17 days
Product Description
58300Liters 24486Kgs 3 FUWA /BPW Axles GLP/LPG/PLG Tank Trailer
1.LPG tank trailer design and produce:

1)LPG tank designing pressure:0.7~2.16Mpa
2)Various types LPG tank is researched and manufactured by stress analysis design and
has obvious advantage of large capacity, light weight and high efficiency.
3)We inspect the quality of LPG tankstrictly, ensure Aand Btype of welding seam pass the examination
of level two radiographic test, C and Dtype of welding seam pass the examination of level one radiographic test.
4)Accessories for LPG tank trailers areof high quality.
5)Anticorrosion coating of LPG tank adopt process:sandblast, spray painting, purging and so on.
2.58300Liters 24486Kg 3 Fuwa /BPW Axles GLP/LPG/PLG Tank Trailer Parameter:
3.GLP/LPG/PLG Tank Trailer Packing & Shipping & Payment:
Payment way:30% TTdeposit after order /confirm/iation, 70% balance should be paid before delivery.
Delivery time: Around 25 working daysafter payment is received.
Shipment: By RORO or Bulk ship.


4.GLP/LPG/PLG Tank Trailer Contact Information:

1.LPG tank trailer design and produce:

1)LPG tank designing pressure:0.7~2.16Mpa
2)Various types LPG tank is researched and manufactured by stress analysis design and
has obvious advantage of large capacity, light weight and high efficiency.
3)We inspect the quality of LPG tankstrictly, ensure Aand Btype of welding seam pass the examination
of level two radiographic test, C and Dtype of welding seam pass the examination of level one radiographic test.
4)Accessories for LPG tank trailers areof high quality.
5)Anticorrosion coating of LPG tank adopt process:sandblast, spray painting, purging and so on.
2.58300Liters 24486Kg 3 Fuwa /BPW Axles GLP/LPG/PLG Tank Trailer Parameter:
| TankerEssentialInformation | |||
| Standard: | |||
| steelpressurevesselGB150-1998 | |||
| pressurevesselsafetytechnologyandinspectionprocedures | |||
| steelpressurevesselweldingprocedures>JB/T4709-2000 | |||
| steelchemicalcontainermanufacturingtechnicalconditionsHG20584-1998 | |||
| pressurevesselcoatingandtransportpackagingJB/T4711-2003 | |||
| Item | ModelNo. | JSX9355LGYYAL | |
| 1 | Dimensions(length*width*height) | 13000*2500*3995(mm) | |
| 2 | EstimatedTareWeight | 15514KG | |
| 3 | Payload | 24486KG | |
| 4 | TotalWeight | 40000KG | |
| 5 | EffectiveVolume | 58.3CBM | |
| ShellOfTanker | |||
| 1 | Products | LPG,Butane,Propane | |
| 2 | Fluidproperty | flammable | |
| 4 | Designtemperature | -40°Cto50°C | |
| 5 | Designpressure | 1.61MPa | |
| 6 | Corrosionallowance | 1.0mm | |
| 7 | Majormaterialsofbearingpressure | Tankerbody:Q345R,12.5mm | |
| Endplate:Q345R,front:10mm,Rear:12.5mm | |||
| MainBeam:T700 | |||
| 8 | Fillingweightpervolume | 420Kg/m3 | |
| 9 | Maximumfillingweight | 24486Kg | |
| 10 | Compartments | One | |
| 11 | Baffleinsidethetank | 14-offAluminumboltedplate,thicknessis5mm | |
| 12 | Shape | Cylindrical;Ellipsehead | |
| Detection | |||
| 1 | Heattreatment | Overallheattreatmentinafurnace,500°Cto560°C | |
| 2 | Flawdetection | 100%Flawdetection | |
| 3 | Hydrostatictest | 2.1MPa | |
| 4 | Magnaflux | Aimatweldingplaceflawdetectioncannotcover | |
| Manhole(Ascustomer'srequirement) | |||
| 1 | Quantity | 1;Ontop | |
| SafetyValve(Ascustomer'srequirement) | |||
| 1 | Quantity | Two | |
| 2 | Location | Onthetopoftanker; | |
| 3 | Type | Onlyweldsuitableflange | |
| 4 | Size | Ascustomer'srequirement | |
| Liquidmeter(Ascustomer'srequirement) | |||
| 1 | QuantityandModel | 1 | |
| 2 | Location | Onleftsideoftanker | |
| 3 | Type | Onlyweldsuitableflange | |
| 4 | Size | Ascustomer'srequirement | |
| ValveandpipeDetail(Ascustomer'srequirement) | |||
| RunningSystem | |||
| 1 | Axles | 3 | 13TonFUWA or BPW Axles |
| 2 | Suspensionsystem | 1 | FUWAAirsuspension |
| 3 | Wheelrim | 7 | 11.75*22.5 |
| 4 | Tyre | 7 | Brand:Triangle,12R22.5vacuum |
| 5 | Kingpin | 1 | 90#/50# |
| 6 | Landinglegs | 1 | 28TonFUWA |
| PneumaticBrakeSystem | |||
| 1 | Springbrakechamber | 6 | FUWA |
| 2 | Airconnector | 1 | FUWA |
| 3 | RelayValve | 1 | BRAND:WABCO |
| 4 | ABS | 1 | WABCOABS |
| ElectronicalSystem | |||
| 1 | 7-PinSocket | 1 | 24V7-pinsocket |
| 2 | LEDLamp | 1 | Allkindsoflamp |
| 3 | Cable | 1 | Standercable |
| Accessories | |||
| 1 | SmallToolbox | 1 | |
| 2 | Wheelcarrier | 1 | |
| 3 | Fireextinguisher | 2 | Withredbox |
| 4 | Cabinet | 1 | |
| 5 | Plasticfender | 6 | |
| 6 | Staticconductivebelt | 1 | |
| 7 | Impellerblasting | 1 | Completely |
| 8 | Paint | 1 | Ascustomerrequirements |
3.GLP/LPG/PLG Tank Trailer Packing & Shipping & Payment:
Payment way:30% TTdeposit after order /confirm/iation, 70% balance should be paid before delivery.
Delivery time: Around 25 working daysafter payment is received.
Shipment: By RORO or Bulk ship.


4.GLP/LPG/PLG Tank Trailer Contact Information:

Product Images
/

